QuestionSwift Manufacturing evaluates two projects. Find the return range, expected return, standard deviation, and coefficient of variation for each project. Also, create bar charts for the returns and determine which project is less risky.

Studdy Solution
Calculate the coefficient of variation for each project.
For Project257Coefficientofvariation=16.8%/43.5%=0.386Coefficient\, of\, variation =16.8\% /43.5\% =0.386For Project432Coefficientofvariation=10.0%/30%=0.333Coefficient\, of\, variation =10.0\% /30\% =0.333The project with the lower standard deviation and coefficient of variation is considered less risky. In this case, Project432 is less risky.